交接表退修案例
当前版本与原始材料
这是 v0.2.0 在线采用说明中的原文参考页。正文里的“候选”“未正式发布”描述冻结时的历史状态;当前公开版已发布,但原有验证范围没有因此扩大。下载、第一次采用以本站导览和正式 Release为入口。下方正文由既有公开文件生成,不覆盖原件或重新打包。
来源与文件校验
来源:mas/evidence/handoff.md
SHA-256:f41bc281b1d418f31fbf5947ac1be154065f7107d001557bedc065e3934c1067
公开基线:9ad57bae229b49a21c09e955373ec47126b7460d
两处修订的证据 · Two changes you can inspect
交接单 / The handoff sheet
以下摘录均来自同一次 WorkBuddy 活动执行包的物料交接单。R1 是审核退回的初稿,R2 是首席交回的修订版。中文引号内取自表格,英文为本页译文。
Both revisions come from the materials handoff sheet in one WorkBuddy activity pack. R1 was returned for changes. The lead delivered R2. Quoted Chinese is transcribed from the cells. English is a translation.
| 原表位置 / Row | R1 | R2 |
|---|---|---|
| C7:未使用的备用材料 / Unused reserve kit | “1 套” / 1 kit. | “1 套(未动用)/0 套(已动用,注明桌号与时间)” / 1 if unused; 0 if used. Record table and time. |
| A4:名牌备品 / Spare badges | “6 张” / 6 badges on the coordinator's handoff list. | 应交数量栏“—”。备注“现场志愿者自 14:00 起保管,随签到台,不纳入本次协调员→志愿者移交”。 / No transfer quantity. The on-site volunteer keeps the badges at check-in from 14:00. Excluded from this coordinator-to-volunteer handoff. |
如何复算。 假设备品只有 1 套,已按计划领用 1 套,实点为 0。R1 的实点减应交为 0 − 1 = −1。R2 为 0 − 0 = 0,另需填桌号和时间。若没有领用,两版均为 1 − 1 = 0。缺领用记录时应先查清,不能把零库存直接认作正常领用。A4 则检验另一件事:一件东西可以确实在场,却根本不属于这两个人本次要清点移交的物品。
Reproduce it. Start with one spare. If a table legitimately takes it, the physical count is zero. R1 yields 0 − 1 = −1. R2 yields 0 − 0 = 0 and asks for the table and time. If the spare stays unused, both give 1 − 1 = 0. A zero count alone does not establish authorized use. A4 tests custody: an item can be present at the venue and still fall outside this particular transfer.
谁检查了哪一版 / Who checked which version
| 制作过程 / Run record | 可核事项 / Recorded outcome |
|---|---|
| 接手半成品 / Intake | 首席确认 20 人底稿,随后接到改为 24 人的要求。 / The lead acknowledged the 20-person draft before handling the increase to 24. |
| 第一次审核 / First review | 审核席打开生产席的 R1。退修意见分别指出名牌的保管人和备品正常领用的处理。 / The reviewer opened production’s R1 and returned two findings on custody and planned use. |
| 局部修订 / Correction | 原生产席另存 R2。R1 得以保留。两版预算均为 ¥1,464。 / The same production seat saved R2 alongside R1. Both budget totals were ¥1,464. |
| 重新验件 / Reinspection | 审核记录载明 R2 复核通过。另据团队本机观察,首席在原对话交回成果及审核记录;交接表本身不能证明该回传。 / The review record accepts R2. The local team observed both files come back in the original conversation; the handoff sheet alone does not establish that transfer. |
来源为 R1 和 R2 交接单第 5.2 节、审核记录中 D1/D2 两条退修意见及 R2 复核结论。这里保留短摘与所在行,便于逐项核对。
Source locations: section 5.2 of each delivered form, review findings D1 and D2, and the R2 acceptance entry. The excerpts retain their row identifiers for comparison.
三项工程亮点的依据 / Evidence behind the three design choices
| 机制 / Mechanism | 例子及证据范围 / Example and scope |
|---|---|
| 权限防呆 / Authority and attribution | 据团队对另一单的回顾,检查协作过程的岗位曾被误写成有权替用户作决定。复核后,团队按用户对那条更正的授权,在原群补正。该单原记录未随本展示包提供。 / In a separate case reported by the team, a coordination note was attributed to the user as a decision. A correction followed the user’s approval. The separate case record is outside this showcase. |
| 上下文隔离与降噪 / Context routing | 组织设计设有工程工作群共享进度,技术、实施和审核席可在同处核对,细节由对应席位处理。活动单中,首席把两条退修意见交给原生产席,再让审核席核同一修订版。前者是组织设计,后者是已发生的一次定向交接。 / The engineering group gives technical, implementation and review seats a shared progress view. Each seat handles its own detail. In the activity run, the lead routed the two findings to the original producer and the revision back to review. The group is a design example; the targeted handoff occurred in this run. Token and latency effects were not measured. |
| 三权分立式质量护栏 / Three scopes of quality oversight | 一席核成品,一席查决定是否落实,另由团队外的复核者检查协作方式。活动单可核第一项。另据团队自述,一次修订审核通过后,目的群仍只有旧稿;复核者回看后发现差异,后来核到更正与旧稿并存。该单原始记录在团队侧。 / One role reviews the artifact, another checks implementation, and an outside reviewer examines how the team works. The activity demonstrates artifact review. In a separate team-reported case, the target group still held an old post after approval; a subsequent check found the correction beside it. The underlying record is held by the team. |
一次运行能提供可读的前后差异。它不能给出长期成功率、节省多少时间或新用户安装成功率。
This run supplies a concrete before-and-after comparison. Long-term reliability, time savings and first-time installation rates were not measured.